Broken wires, faulty renovation caused India bridge mishap: Probe

Investigation into lethal collapse of suspension bridge in Gujarat’s Morbi city finds a number of structural and operational violations.

Damaged corroded wires, improper welding and adjustments to the strolling floor of a 145-year-old hanging bridge in India contributed to its collapse final yr that killed 135 folks, an investigation has discovered.

The colonial-era suspension bridge in Morbi city within the western state of Gujarat was full of sightseers when it collapsed on October 30, plunging lots of into the Machchhu river. It had reopened simply days earlier than, following months of repairs.

A five-member particular investigation workforce, fashioned by the state authorities, discovered that the primary cables weren't inspected or changed, no load check or structural check was carried out earlier than opening the bridge and much more folks had been current on the bridge throughout the incident than its capability.

“Primary cable of the upstream facet was discovered damaged on one facet,” in keeping with a preliminary investigation report seen by the Reuters information company on Monday.

“Out of the 49 wires of the primary cable, 22 had been corroded which signifies that these wires could also be already damaged earlier than the incident. The remaining 27 wires not too long ago broke.”

India Gujarat bridge
Folks cling to the collapsed suspension bridge in Morbi [File: ANI/ Handout via Reuters]

The bridge – 233 metres in size and 1.25 metres vast – had been closed for greater than seven months for repairs till the week of the lethal collapse.

Safety digicam footage confirmed a bunch of younger males taking images whereas others tried to rock the bridge backward and forward within the moments earlier than the cables snapped and so they plunged from the slender walkway.

Sandeepsinh Zala, Morbi’s municipal chief on the time of the collapse, was suspended by the state in November whereas police final month arrested Jaysukh Patel, the managing director of the Oreva Group, which had been given the contract for repairing and working the construction.

The Oreva Group didn't instantly reply to an emailed request for remark.

The report mentioned the renovated deck on the bridge was incorrectly joined by welding previous suspenders with new ones, whereas picket planks had been changed by aluminium sheets.

“If there have been particular person picket planks as an alternative of an aluminium deck, then attributable to its versatile behaviour, the variety of casualties might have been much less,” the report mentioned, including that the primary cables and suspenders had not been examined throughout the renovation.

The report mentioned Zala didn't act as per legislation in signing the settlement with Oreva, an organization finest identified for making clocks and electrical merchandise. The report blamed Oreva for permitting folks unrestricted entry to the bridge and inadequate safety preparations.

“Restore work was carried out with out consulting competent technical consultants. The corporate outsourced the restore works to a non-competent company,” it mentioned.

Zala declined to remark as a result of the matter was in courtroom.

Post a Comment

Previous Post Next Post